Optimal project scheduling with random activity durations
Ranjan Ghosh
Reading Time
at 250 WPM23 minutes
The average reader, reading at a speed of 250 WPM, would take 23 minutes to read Optimal project scheduling with random activity durations.
Personalise your estimate by entering your reading speed below
Test my reading speedEnter speed in words per minute
1
day at 30 min/day
23
total minutes
Optimal project scheduling with random activity durations
by Ranjan Ghosh
Published
1981
Publisher
Indian Institute of Management
Pages
23
Frequently Asked Questions
How many pages are in Optimal project scheduling with random activity durations?
This edition of Optimal project scheduling with random activity durations has approximately 23 pages. Please note, this is an estimate and the exact page count can vary between hardcover, paperback, and e-book versions.
How long does it take to read Optimal project scheduling with random activity durations?
For most readers, Optimal project scheduling with random activity durations typically takes between 29m and 19m to complete. This is based on the book's length of approximately 5,750 words and common reading speeds.
Here's a detailed breakdown: • Continuous reading at 250 WPM: approximately 23m of focused reading • Casual reading (30 minutes/day): you could finish in roughly 1 day • Estimated word count: 5,750 words
Your individual reading time will vary based on your personal reading pace, the amount of daily reading time, and your familiarity with the subject matter.
What is the word count of Optimal project scheduling with random activity durations?
The estimated word count for Optimal project scheduling with random activity durations is approximately 5,750 words. This figure is calculated using industry-standard methods that consider genre-specific word density patterns, typical formatting and layout characteristics, and standard words-per-page ratios for published books.
This is an approximation — actual word count may vary based on font size, formatting, edition, and the presence of illustrations or charts.
Who is the author of Optimal project scheduling with random activity durations?
Optimal project scheduling with random activity durations was written by Ranjan Ghosh.
When was Optimal project scheduling with random activity durations published?
The publication date for this specific edition is 1981. The original work may have been published on a different date.